Approach Services Sectors Clients Insights Start a conversation
Productised service · Ageing & Life Extension

Screening assets at or
beyond design life.

Evidence ingested, condition and ageing screened by discipline, safety systems assessed, risk weighted, and a costed position handed over — one position per asset. Aligned to ABS LEX, OGUK Ageing & Life Extension and ISO 55001.

Engagement orchestrator · orchestrates, does not duplicate

Life Extension Screening Lead

Frames the service-life question, sets the screening boundary, sequences the six phases, and integrates their evidence into one position per asset — holding the handover gate into PLEP development, investment or retirement. Each phase lead owns its own discipline evidence; the class society and regulator interface sits here.

Six phases, left to right

Each phase is led by one discipline and supported on call. Findings converge on a single risk-weighted register.

PH 01

Data ingestion & baseline

Register, design life, inspection, failure and MOC history assembled — with a data-confidence grade per asset.

Lead · Asset Information Manager
PH 02

Static, structural & pipeline

Condition and inspection position of the pressure envelope and structure, with FFS screening on flagged anomalies.

Lead · ASME Plant Inspector
PH 03

Mechanical & rotating ageing

Failure and condition data read for the signature of wear-out: Weibull, bad actors, MTBF and P-F position.

Lead · Reliability Expert
PH 04

E&I ageing & supportability

Electrical, instrumentation and obsolescence position — the estate whose support disappears first.

Lead · Electrical Engineer
PH 05

SIL & safety systems

Can the instrumented safety layer still make its SIL claims? SIF register, proof-test coverage and barrier impact.

Lead · Functional Safety Engineer
PH 06

Risk, options, cost & handover

Risk-weighted options and whole-life cost — extend, refresh, replace, retire — including the cost of doing nothing.

Lead · Asset Investment Planner
The converging deliverable

The Life Extension Position Statement

One position per asset: condition, wear-out evidence, E&I supportability, SIL confidence, barrier impact and cost — each with a confidence grade from the data pack. Four exits, each fundable on its own, handed over at the gate.

PLEP development Targeted inspection campaign Refresh or replace investment Retire & decommission

Is the asset still fit to run?

Start with one asset boundary. We'll screen it against design life and hand back a costed position.